Designing new spaces is more than ever redesigning life

Getting back on construction site after more than two months. Meeting each other again after flows of smart working to reschedule plans and to share anti-contagion safety protocols. Inspecting the conditions of works and materials. Above all, checking the status of trees, ornamental shrubs and groundcovers left to themselves right after planting or waiting in the nursery since the Italian lockdown of March 22.

Spring does not listen to ministerial decrees. Today Phase 2 begins with the partial recovery of activities. We are grateful to be part of it, and to accept the challenge of Covid-19 as architects that design places to share. Because we have new landscapes to grow.